Oops! Có lỗi đã xảy ra, vui lòng thử lại.

Staff for Job Management of Research and Material Analysis (1)

Marubeni Corporation ( Japan) – Vietnam Power Project Office 10th Floor, Sun city Building, 13 Hai Ba Trung, Ha Noi; Project Location: My Loc Commune, Thai Thuy District, Thai Binh Province

Nơi làm việc: Thái Bình


1282 lượt xem
Đăng tuyển 9 ngày trước

các phúc lợi dành cho bạn

Follow the company policy

Bạn Nên Có Kỹ Năng

Analysis & Plan
Sampling Planning
English - Good

Bạn Sẽ Làm Gì

Management material analysis to support commissioning quality control and plant performance guaranty

(1) Monitoring sampling works and reviewing analysis results
(2) Raw material management to control delivery lot and its quality
(3) Reporting (1)-(2) above
(4) Communication and coordination with relevant parties for above (1) – (2) purposes

And the staff is required to practice under management instructions.
Mean whole the staff is required to take required actions for coordination with relevant parties to proceed the functions in above.

Major duty and responsibility are as follows under management instructions, but not limited.
- DUTIES AND RESPONSIBILITIES
1. Monitoring sampling works and reviewing analysis results
Monitoring sampling works and reviewing analysis results;
- Water Quality
- Gas Emission Monitoring
- Air Conditions
- Noise Monitoring
- Coal / Heavy Fuel Oil/ Diesel Oil Components
- Limestone Characteristics
- Ash Characteristics
But, not limited

2. Material management to control delivery lot and its quality
- Major functions are as follows, but not limited,
- Schedule coordination for sampling works for items in 5.1
- Monitoring and instruction of sampling works
- Review of analysis results
- Raw material management to control lots of delivered raw materials and its quality, inventory monitoring to prevent making mix of different quality materials

3. Reporting (1) - (2) above
(1) - (2), 5.2, shall be reported timely.

4. Communication and coordination with relevant parties for above (1) – (2) purposes
Communication and coordination with relevant parties, EPC contractor internally

5. Safety Control
The staff shall comply with Marubeni safety management system by Marubeni HSE policies and HSE manual and support division manager to enhance safety activity, control safety mainly site field works with appropriate mitigation plan for potential risks in order to achieve zero accident of the employees and subcontractors.
Staff shall support emergency response actions based on emergency response plan on emergency in order to take quick and suitable measures.
Instruction to subcontractor to comply Marubeni HSE management shall be function by chief engineer and his/her staffs.

6. Others
(1) Assist communication between division manager and its staffs to execute job directions by division manager timely
(2) Support division manager to improve atmosphere and environment of work place by cooperation with related persons in order to create active, bright and disciplined.
(3) Perform other tasks that are assigned by division manager

- INTERACTION
Each division of project, Relative companies, Subcontractors, Venders

Chuyên Môn Của Bạn

COMPETENCIES, KEY SELECTION CRITERIA:
(1) Experience: 3 or more years for field sampling working or analysis practice with laboratory instruments
(2) English skill shall be enough to properly translate the legal documents and interpret to assist smooth communications in between Marubeni and other parties.

Về Công Ty Chúng Tôi

Marubeni Corporation ( Japan) – Vietnam Power Project Office 10th Floor, Sun city Building, 13 Hai Ba Trung, Ha Noi; Project Location: My Loc Commune, Thai Thuy District, Thai Binh Province

Tên người liên hệ: HR Department
Qui mô công ty: 100-499

Thai Binh Thermal Power Plant and Transmission Lines Constructions Project:
Marubeni Corporation (Japan) – Vietnam Power Project Office is looking for suitable candidate for the following position in Thai Binh Thermal Power Plant Project in My Loc Commune, Thai Thuy District, Thai Binh City

The construction of Thai Binh thermal power plant began on 22/02/2014, with a combined design capacity of 600MW and an annual electricity production of 3.6 billion KWh.

The plant is being built in My Loc Commune of Thai Thuy District in the northern province of Thai Binh by the Electricity of Viet Nam Group (EVN) and Japanese contractor Marubeni at a cost of VND26.5 trillion (US$ 1.27 billion).

The 115- hectare plant consists of two turbines. The first turbine is scheduled to begin generating power in November 2017, and the second in May 2018.

Việc làm khác từ Công ty này

Công Ty Tương Tự

Tuyển Sinh Thạc Sỹ Marketing & Dự Báo (Học Tại Hà Nội)

Tuyển Sinh Thạc Sỹ Marketing & Dự Báo (Học Tại Hà Nội)

Không phải thi đầu vào, chỉ xét duyệt hồ sơ và phỏng vấn.

Học phí toàn khóa học chỉ có 105 Triệu.

Học ngoài giờ hành chính và cuối tuần.